Power: | AC 380±10% 50Hz ,3 Phase 4 Wires +Ground Wires | Ambient Temp: | +5ºC~+35ºC |
---|---|---|---|
Low Temp Chamber: | -55ºC~-10ºC | High Temp Chamber: | +60ºC~+200ºC |
Exterior Material: | Baked Painting Steel | Insulation Material: | Glass Wool |
High Light: | temperature shock test chamber,environmental testing chambers |
High Low Temperature cycling chamber 3 Zone Thermal Shock Test Chamber
More information , pls kindly contact anna@komegtech.com
1.Application
High Low Temperature cycling chamber 3 Zone Thermal Shock Test Chamber thermal curing room
is used to test the bearing extent of the material structures and composite material in an instant
and continuous high temperature and extremely low temperature environment , that is in the
shortest time to test its thermal expansion and contraction caused by chemical change or physical
harm. Testing box is divided into two parts, one is high-temperature zone, another is low-
temperature zone, the testing samples are placed in the moving basket, using unique heat storage
and cool storage, the cylinder taking basket moves up and down in hot zone and cold zone to
complete the extremely high and low temperature impact testing.
Technical Specification
(1) KTS-A Series
Model |
|
||||||||
72A | 100A | 150A | 200A | 252A | 300A | 480A | |||
Inside size(mm) | W | 450 | 500 | 600 | 670 | 700 | 800 | 800 | |
H | 400 | 450 | 500 | 600 | 600 | 600 | 800 | ||
D | 400 | 450 | 500 | 500 | 600 | 650 | 750 | ||
Outside size(mm) | W | 1490 | 1540 | 1640 | 1720 | 1750 | 1850 | 1850 | |
H | 1790 | 1840 | 1890 | 2000 | 2000 | 2000 | 2200 | ||
D | 1600 | 1700 | 1830 | 1850 | 1930 | 1980 | 2500 | ||
Test weight | 5 | 10 | 12 | 15 | 18 | 20 | 20 | ||
Low Temp Chamber | -55ºC~-10ºC, Pre cooling time: ≤ 60 min from +20ºCto-55ºC | ||||||||
Test Chamber | -40ºC~+150ºC | ||||||||
High Temp Chamber | +60ºC~+200ºC ,Within 20 min, Pre-heating time | ||||||||
Transition time | ≤15S | ||||||||
Recovery time | High-Temp Exposure 30 min to reach & stabilize required hot temp of test sample | ||||||||
Low-Temp Exposure 30 min to reach & stabilize required cold temp of test sample | |||||||||
≤ 5 min | |||||||||
Ambient Temp | +5ºC~+35ºC | ||||||||
Power | AC 380±10% 50Hz ,3 phase 4 wires +Ground Wires |
(2) KTS-B Series
Model |
|
||||||||
72B | 100B | 150B | 200B | 252B | 300B | 480B | |||
Inside size(mm) | W | 450 | 500 | 600 | 670 | 700 | 800 | 800 | |
H | 400 | 450 | 500 | 600 | 600 | 600 | 800 | ||
D | 400 | 450 | 500 | 500 | 600 | 650 | 750 | ||
Outside size(mm) | W | 1490 | 1540 | 1640 | 1720 | 1750 | 1850 | 1850 | |
H | 1790 | 1840 | 1890 | 2000 | 2000 | 2000 | 2200 | ||
D | 1600 | 1700 | 1830 | 1850 | 1930 | 1980 | 2500 | ||
Test weight(KG) | 5 | 10 | 12 | 15 | 18 | 20 | 20 | ||
Low Temp. chamber | -70ºC~-10ºC ,Pre cooling time: +20ºC~-70ºC ,≤ 60 min | ||||||||
Test. Chamber | -55ºC~+150ºC | ||||||||
High Temp. chamber temperature | +60ºC~+200ºC,Preheating time: ≤20 min | ||||||||
Transition time | ≤15S | ||||||||
Recovery time | High-Temp Exposure 30 min to reach & stabilize required hot temp of test sample | ||||||||
Low-Temp Exposure 30 min to reach & stabilize required cold temp of test sample | |||||||||
≤ 5 min | |||||||||
Ambient Temp. | +5ºC~+35ºC | ||||||||
Power | AC 380±10% 50Hz ,3 phase 4 wires +Ground Wires |