Product Details:
Payment & Shipping Terms:
|
Temperature Range: | -20℃ ~ +70℃ | Temperature Fluctuation: | ±0.5℃ |
---|---|---|---|
Workspace Volume: | W500 Mm*H500 Mm*D500 Mm | Door: | Single Door, Left Open |
Observation Window: | Explosion-protected Observation Window | Explosion-protected Chains: | Two Explosion-protected Chains |
High Light: | high temperature test chamber,temperature testing equipment |
Air - Cooled 125LSingle door high and low temperature test chamber with Explosion-proof device
Application
The chamber structure stainless steel plate is processed by CNC machining,the appearance is beautiful
and dignified,using non-reaction mechanical handle, safe and easy operation;internal wall using matte
stainless steel SUS#304,external wall apply A3 steel panel with spraying coat, improving the outside
neatness;suitable for electrical, electronics, machinery and other products, parts, materials, etc.under
high or low temperature conditions on the products,parts,materials quality and reliability testing.
Applicable to environmental adaptability and reliability test in such industrial units as electronics, electrical
appliance, battery, plastics, food, paper product, vehicle, metal, chemistry, building material, research
institution, inspection and quarantine bureau, university etc..
Specifications
2.1 Test space | About 125L |
2.2 Interior size | W500 mm*H500 mm*D500 mm |
2.3 Exterior size |
W700 mm*H1535 mm*D1525 mm(Excluding the protruding part of the machine!) Tips: For external dimensions, please confirm according to the final design! |
2.4 Floor area | About 1.1m2;(confirm after place the order) |
3. Main technical parameters
3.1 Test Conditions |
Equipment cooling method: fresh air type Measured at room temperature +25 ° C under no load, the temperature performance test is measured according to the relevant regulations IEC 60068 -3; the sensor is placed at the air outlet of the unit |
3.2 Temperature range | -20℃ ~ +70℃ |
3.3 Temperature fluctuation | ±0.5℃ |
3.4 Temperature uniformity | ≦2.0℃ |
3.5 Temperature deviation | ≦±2.0℃ |
3.6 Temperature change rate |
Heat up rate: -20℃~+70℃, average 3℃/min;(no laod) |
Cooling rate: +20℃~-20℃, average 1℃/min;(no laod) |
|
3.7 Load | No |
3.8 Noise | ≦75 (dB) (The noise detection device is measured 1m away from the door of the chamber) |
3.9 Meet the test standard |
GB-2423.1-2008(IEC68-2-1)Test A: Low temperature test method. GB-2423.2-2008(IEC68-2-2)Test B: High temperature test method. GJB360.8-2009(MIL-STD.202F)High temperature life test. GJBl50.3-2009(MIL-STD-810D)High temperature test method. GJBl50.4-2009(MIL-STD-810D)Low temperature test method. |
4. Chamber construction
4.1 Construction type |
Integral box structure The test box consists of three parts: the main insulation box, the air conditioning system, and the electrical control cabinet. |
4.2 Thermal insulation structure | Outer box color steel plate - intermediate insulation layer is temperature resistant foam insulation material - inner box SUS304 stainless steel |
4.3 Outer box material | Outer box color steel plate |
4.4 Wall material | SUS304matte stainless steel plate,Thickness=1.0 mm;Inner box full welding |
4.5 Insulation | Rigid polyurethane foam insulation layer,Thickness=100mm, flame retardant grade B2. |
4.6 Door
|
Single door, left open,;Explosion-proof handle Two silicone rubber sealing strips and anti-condensation electric heating device at he door frames to prevent condensation at low temperatures; |
4.7 Observation window |
Observation window on the door(size:W210*H270MM) Multi-layer vacuum glass window with electronic film for heat and sweat defogging protection. Glass enclosed stainless steel protective net, to prevent the explosion when flying glass (can not guarantee absolute safety). |
4.8 Explosion-protected chains |
Two explosion-protected chains are added on both sides of the box door. The chain is longer. When the box is opened, it can be opened a bit, letting Quick release of internal air pressure, but no pop. |
Environmental test chamber Standard
GJB150.3 high-temperature testing
GJB150.4 low-temperature testing
GJB150.9 humid testing
GB11158 Technical conditions for high-temperature testing box
GB10589-89 Technical conditions for low-temperature testing box
GB10592-89 Technical conditions for high and low temperature testing box
B/T10586-89 technical conditions for humidity testing chamber
GB/T2423.1-2001 Low-temperature testing methods
GB/T2423.2-2001 High-temperature testing methods
B/T2423.3-93 Testing Method for humidity Test Chamber
GB/T2423.4-93 Alternating hot and humid testing method
GB/T2423.22-2001temperature testing method
IEC60068-2-1.1990 low-temperature testing method
IEC60068-2-2.1974 high-temperature testing method
FAQ:
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about
the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link
power in your lab, then can start to operate;
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it;
Thirdly, some of customized chambers we should to install and teach your team to operate.
Product details
Packing details
We use PP Film wrapping the test chamber to protect the test chamber from moisture or being scratched
first, then use strong plywood case for easyload and transport, and to keep the chambers from potential
crash or impact.
After-sale Service:
If you face any problems in future during testing process we promise we will give you a reply within 48
hours and solution provide within 3 working days. We can offer operation video and English operation
muanual. We can provide video-conference. If customers require on-site service, the transport and travel
expense shall be borne by customer.
Contact Person: Anna Hu
Tel: +8618098282716