Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
KOMEG Technology Ind Co., Limited
Home ProductsThermal Cycling Chamber

Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing

China KOMEG Technology Ind Co., Limited certification
China KOMEG Technology Ind Co., Limited certification
Fast delivery and quality products.

—— Gozia

Friendly and pleasant cooperator, "I like the factory, I like the design, I like the workstyle"

—— Wagner

The design and quality impress me a lot.

—— Mr Yee

" A trustworthy supplier of climatic test chamber".

—— Denis

I'm Online Chat Now

Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing

Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing
Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing

Large Image :  Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing

Product Details:
Place of Origin: China
Brand Name: KOMEG
Certification: CE, , ISO
Model Number: ESS-1000SL15
Payment & Shipping Terms:
Minimum Order Quantity: 1SET
Price: negotiation
Packaging Details: Strong Plywood Case
Delivery Time: 50 days upon your deposit
Payment Terms: T/T, negotiable
Supply Ability: 1, 000 SETS / YEAR
Detailed Product Description
Product Name: Repid Temp Change Chamber Application: Reliability Testing, Research & Development Testing, Failure Analysis
Working Chamber Volume (L): 1000L Power Source: AC380V
Cooling Mode: Water Cooled Temp. Rate Of Change ºC /Min: 15 ºC /Min
High Light:

Thermal Cycle Chamber

,

environmental test chambers

 
Quality Rapid-Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing​
 
 
1. Applications:
 
KOMEG Turnkey Environmental Stress Screening (ESS) Systems are specially designed to meet a range of ESS testing applications. ESS Systems consist of a test chamber, controller, product fixture, interconnect and wiring, and a functional tester.
 
Environmental stress screening (ESS) is also known as Burn-in, AST (Accelerated Stress Testing), HALT (Highly Accelerated Stress Test), or HASS (Highly Accelerated Stress Screening). No matter what the name is, the idea is the same: create a test program that allows you to eliminate the infant mortality of your products.
 
Developed to help electronics manufacturers detect product defects and production flaws, Environmental Stress Screening forces infancy product failures that would otherwise occur after final assembly and product delivery. ESS Chambers’ goal is to improve profitability by eliminating defective products. ESS Systems can meet individual performance needs, product loading, and throughput requirements. KOMEG Technology has the experience to provide the best solution for ESS testing at your company.

 
 
 
 
2. Thermal Cycling Chambers' Features:
 
Standard Water cooled systems
Copper tubing cooling coils with aluminum fins;
Solder-in-place components minimize leakage;
High temperature silphosed or silver soldered joints
Stainless steel drip pans in both compressor and cascade compartments contain condensate;
HFC refrigerants;
 
Electrical Features
Nichrome wire heating elements;
Fail safe fusible link high heat limit protection;
Door interlocks to prevent test interruption;
 
Lockable enclosed cabinet
Cable access ports
Fast Product Change Rates
Vertical or horizontal airflow configuration and
Ethernet Interface

 
 

 
 
3. Specifications
 

Model

ESS-SL

1000SL15

Working Chamber Volume(L)

1000L

Temp Rate of Change(  ºC /Min)

15 ºC /Min

Temperature Range

 -70 ºC~+100 ºC( Rapid Temp Change -55 ºC~+85 ºC Full Linear Control)

Humidity Constancy

±0.5 ºC

Temp Constancy

±3.0 ºC

Exterior Material

Cold-rolled steel sheet (Rust proof & Plastic Spray treated )/ Stainless Steel

Interior Material

Stainless Steel Plate(SUS 304)

Insulation Material

Rigid Polyurethane Foam

Safety Devices

over pressure,over heat and over current protection for compressor, over temp. protection,

Compressor

Semi-Hermetic Compressor

Cooling Mode

Water Cooled

Control system

Balanced Temperature & Humidity Control System(BTC type)

Heater

Iron-chrome wire heater

Blower

Centrifugal Blower

Observation Window

Glass incorporating heat generator

Temp Sensor

Pt-100

Controller

Touch screen programmable controller

Ambient Temp.

+5ºC~+35ºC

Power

AC 380V/50Hz 3phase 5 wires+ Ground wire

Note: 1. We reserve the right to change specifications without prior notice 2. Customized sizes and configurations available

 
 

 
4. ESS Test Chambers Application on Solar Panel PV Module Industrial:
 
Solar Panel Test Conditions is as below:
 
Thermal Cycle Test Profile
 
Suggested Test Profile:
Step 1: Ramp from ambient to -40 ℃ (100 ℃/hr max on module, or 39 minutes) (UL ramp is air temp.)
 
Step 2:Hold -40 ℃ for 10 minutes minimum (±2 ℃)
 
Step 3: Ramp to 85 ℃ (100 ℃/hr max on module, or 75 minutes) (UL 90 ℃, ramp is air temp.)
 
Step 4: Hold at 85 ℃ for 10 minutes minimum (±2 ℃) (UL 90℃)
 
Step 5: Ramp to 23 ℃(100 ℃/hr max on module, or 36 minutes) (UL ramp is air temp.)
 
Step 6: Go to step 1. Cycle 50 or 200 times.(UL 200 times)
 
Testing time:
Note: Total time per cycle is not to exceed six hours.
Fastest cycle time is 170 minutes/2.8hours (ramping at 100 ℃/hr)
Slowest cycle time is 360 minutes/6hours (ramping at 44 ℃/hr)
 
Total test time: Maximum ramp rate: 6 days or 24 hours.
 
 
 
Humidity-Freeze Test Profile
 
Suggested test profile:
Step 1: Ramp from ambient to 85 ℃/85%(100 ℃/hr max on module, 36 minutes)
 
Step 2: Hold 85/85 for 20 hours minimum (±2 ℃, ±5%)
 
Step 3: Turn off humidity control. Ramp to 0 ℃ (100 ℃/hr max on module, 51 minutes)
 
Step 4: Ramp to -40 ℃ (200 ℃/hr max on module, 12 minutes)
 
Step 5: Hold -40 for 0.5 hour (±2 ℃, 30 minutes)
 
Step 6: Ramp to 0 ℃ (200 ℃/hr max on module, 12 minutes)
 
Step 7: Ramp to 23 ℃(100 ℃/hr max on module, 51 minutes)
 
Step 8: Go to step 2 . End test after ten cycles.
 
Note:
Maximum total time for steps 3 to 7, plus step 1, is four hours.
Minimum time possible is 156 minutes, or 2.6 hours.
 
Total test time: 9.4 – 10 days
 
 
 
5. Structure:
 
Overall structure, new test chamber designed very easy to operation and maintenance:
Water and electricity system separation design;
External humidifying design;
Three levels of overheat protection, easy access for refrigeration servicing, etc.
 
 
 
6. Material:
 
machines for sheet metal processing;
Tecumseh, Bock Compressor;
High quality electronic components (e.g. DANFOSS, ALCO, RANCO, SPORLAN, SAGINOMIYA, Schneider solenoid valve)
 
 
 
 
Rapid - Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing 0
 

Contact Details
KOMEG Technology Ind Co., Limited

Contact Person: Peter Zhang

Tel: +8615818392160

Send your inquiry directly to us (0 / 3000)