Product Details:
Payment & Shipping Terms:
|
Model: | KMH-225L | Temp. Range: | -40°C ~150°C |
---|---|---|---|
Display Resolution: | 0.1°C | Temperature Stability: | High±0.5°C ,low ±1.0°C |
Temperature Uniformity: | ±2.0°C | Heat Up Time: | -40°C ~+100°C,within 45 Min |
Pull Down Time: | +20°C ~-40°C,within 60 Min | Total Power: | 6.5KW |
Max Current: | 13.6A | ||
High Light: | environmental test cabinet,environmental test equipment |
New deisgn 225LTest Chamber for PV Module Dynamic 85% at 85C Testing
1. Application:
temperature humidity chambers doing 85% at 85C testing. You can see the new design and the testing performance.
2. Features:
The new general design improved several parts:
water and electronical system separate design, outside humidifying, so the electronics components has long service life;
the controller is located on the left part of door, space-saving, much convenient for operation.
the electrical control panel is located on the left. . .
3. Test Model or test project
1). Damp Heat Test:
Test Condition: 95 ±2 ºC temperature range , and 95% ±5% R.H. humidity range
Test Duration: last for 1000H,
Test Purpose: To see the reliability of the module to withstand the effects of long-term penetration of heat and humidity.
2). Humidity-freeze test
Test Purpose: to see the ability of the module to withstand the effects of high temperature and humidity followed by sub-zero temperatures.
Test points and requirements:
-40ºC lowest temperature and 85ºC highest temperature
Max temperature rising speed rate:200ºC/Hour=3.33/min
Max temperature falling speed rate:200ºC/Hour=3.33/min
24 hours per cycle, testing for 10 cycles, 240 hours (10 days)
Temp. Cycle Compare |
High Temp. High Humidity |
Low Temp |
Temp. Change Rate |
Cycle No. |
IEC61215 |
85ºC/85±5%(20h) |
-40ºC(0.5~4h) |
High Temp. Rise& Fall(100ºC/h) |
10 |
GB9535 |
85ºC/85±5%(20h) |
-40ºC(0.5~4h) |
High Temp. Rise& Fall(100ºC/h) |
10 |
IEC61646 |
85ºC/85±5%(20h) |
-40ºC(0.5~4h) |
High Temp. Rise& Fall(100ºC/h) |
10 |
GB18911 |
85ºC/85±5%(20h) |
-40ºC(0.5~4h) |
High Temp. Rise& Fall(100ºC/h) |
10 |
UL1703 |
85ºC/85±2.5%(20h) |
-40ºC(0.5~4h) |
High Temp. Rise& Fall(100ºC/h) |
10 |
IEC62108 |
85ºC/85±2.5%(20h) |
-40ºC(0.5~4h) |
High Temp. Rise& Fall(100ºC/h) |
20 |
3). Thermal cycle test;
Test requirements: -40ºC lowest temperature and 85ºC highest temperature
Temperature falling/rising speed rate:100ºC/Hour=1.67ºC/min,6 hours per cycle,
Test Duration: 50~200 cycles
total testing time last 300 to 1200 hours (12.5 to 50 days)
Temp. Cycle Compare |
Low Temp |
High Temp |
Temp Change RateºC/h |
Dwell Time |
Cycle Number. |
IEC61215 |
-40±2ºC |
85±2ºC |
Max. 100ºC/h |
Min.10min |
50, 200 |
GB9535 |
-40±2ºC |
85±2ºC |
Max.100ºC/h |
Min.10min |
50, 200 |
IEC61646 |
-40±2ºC |
85±2ºC |
Max.100ºC/h |
Min.10min |
50, 200 |
GB18911 |
-40±2ºC |
85±2ºC |
Max.100ºC/h |
Min.10min |
50, 200 |
UL1703 |
-40±2ºC |
90±2ºC |
Max.120ºC/h |
30~105min |
200 |
IEC62108 |
-40±2ºC |
65ºC,85ºC,110ºC |
10cycle/day |
10min |
500,1000,2000 |
IEC62108 |
-40ºC |
65ºC,85ºC,110ºC |
18cycle/day |
10min |
500,1000,2000 |
IEEE1513 |
-40ºC |
90ºC,110ºC |
0.9~7.5ºC/min |
Min.10min |
250,500 |
IEEE1513 |
-40ºC |
90ºC,110ºC |
Max.100ºC/h |
Min.10min |
100,200 |
IEEE1513 |
-40ºC |
60ºC,90ºC |
Max.100ºC/h |
Min.10min |
50,200 |
4. After-sale service:
Feedback within 2 hours, offer solution in 48 hours and help to solve the problems.
5. Package:
PP film first, and then 10mm foam between machine and the case, and outside is standard export plywood case.
6. About KOMEG:
As a professional manufacturer and the best brand climatic chamber in China, KOMEG specialized in Environmental testing equipment for quality conscious people since 1990. Our products are CE approved and we are the supplier for ,UL, and world top 500 companies.
7. What are KOMEG’s Customers?
Our customers are the most important people ever in KOMEG Company. Our customers are not dependent on us KOMEG; We KOMEG are dependent on them. Our customers are not an interruption of our work; there are the purposes of it. We are not doing our customers a favor by serving them, there are doing us a favor by giving us an opportunity to do so. Our customers are not an outsider to our business, there are parts of it. Our customers are not someone to argue with; nobody ever won an argument with a customer. Our customers are not people who bring us their wants; it is our job to fill them profitably to them and to ourselves.
8. Product pictures
Contact Person: Peter Zhang
Tel: +8615818392160