Product Details:
Payment & Shipping Terms:
|
Temperature Range: | +20℃ ~ +100℃ | Temperature Fluctuation: | ±0.5℃ |
---|---|---|---|
Workspace Volume: | W 1100 × H 2000 × D 1000 Mm | Door: | Single Door, Left Open |
Observation Window: | With Observation Window (W 340×H 500mm) | ||
High Light: | 2200L High And Low Temperature Test Chamber,SSR High And Low Temperature Test Chamber |
Air Cooling 2200L Single Door High and Low Temperature Test Chamber Climatic Devices
The chamber structure stainless steel plate is processed by CNC machining,the appearance is beautiful
and dignified,using non-reaction mechanical handle, safe and easy operation;internal wall using matte
stainless steel SUS#304,external wall apply A3 steel panel with spraying coat, improving the outside
neatness;suitable for electrical, electronics, machinery and other products, parts, materials, etc.under
high or low temperature conditions on the products,parts,materials quality and reliability testing.
Applicable to environmental adaptability and reliability test in such industrial units as electronics, electrical
appliance, battery, plastics, food, paper product, vehicle, metal, chemistry, building material, research
institution, inspection and quarantine bureau, university etc..
Specifications
Ⅳ. Main Technical Parameters (Air cooled, room temperature +25℃, no load ) | ||
1. Temperature | ||
1.1 Temperature range | +20℃ ~ +100℃ | |
1.2 Temp Fluctuation | ±0.5℃ | |
1.3 Temp Uniformity | ≦2.0℃ | |
1.5 Ramping and soaking rate |
Heating up rate: 20℃↑ +100℃ 3℃/min (no-load) Cooling rate: +100℃↓20℃ 1℃/min (no-load) |
|
Temperature and humidity performance test is in accordance with the relevant provisions of the IEC60068 -3 standard measurement; sensor placed in the unit outlet. | ||
Ⅴ. Chamber Structure | ||
Overall structure and chamber was composed of three parts as below. Insulation box, separate refrigeration units, and electrical control cabinet. |
||
|
Workspace volume: W 1100 × H 2000 × D 1000 mm Exterior size: about W 1600 × H 2345 × D 1990 mm |
|
2. Insulation box |
Wall material: high-quality carbon steel with static color spray Inner wall material: SUS304 # matte stainless steel plate Insulation materials: rigid polyurethane foam insulation layer + glass fiber. |
|
|
Single door, left open. Heating wire was installed at the door frames to prevent condensation at low temperatures. | |
4.Observation window | With observation window (W 340×H 500mm), multi-hollow electric insulation coated glass prevent condensation effectively | |
5.Lighting device | 11W/AC220V *1 located on observation window | |
6. Heating |
High quality nickel-chromium alloy wire electric heaters, Non-contact control mode(SSR) |
|
7. Water outlet hole | Available for drain the condensate water | |
8. Cable port | Φ50mm*1 located on each side of chamber, with rubber stopper and stainless steel cover | |
9. Shelf for samples | No | |
10. Mobile Casters | Mobile Casters *4 with foot cups | |
11.Electric control box | Total power circuit breaker, over-temperature protection. |
Environmental test chamber Standard
GJB150.3 high-temperature testing
GJB150.4 low-temperature testing
GJB150.9 humid testing
GB11158 Technical conditions for high-temperature testing box
GB10589-89 Technical conditions for low-temperature testing box
GB10592-89 Technical conditions for high and low temperature testing box
B/T10586-89 technical conditions for humidity testing chamber
GB/T2423.1-2001 Low-temperature testing methods
GB/T2423.2-2001 High-temperature testing methods
B/T2423.3-93 Testing Method for humidity Test Chamber
GB/T2423.4-93 Alternating hot and humid testing method
GB/T2423.22-2001temperature testing method
IEC60068-2-1.1990 low-temperature testing method
IEC60068-2-2.1974 high-temperature testing method
FAQ:
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about
the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link
power in your lab, then can start to operate;
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it;
Thirdly, some of customized chambers we should to install and teach your team to operate.
Product details
Packing details
We use PP Film wrapping the test chamber to protect the test chamber from moisture or being scratched
first, then use strong plywood case for easyload and transport, and to keep the chambers from potential
crash or impact.
After-sale Service:
If you face any problems in future during testing process we promise we will give you a reply within 48
hours and solution provide within 3 working days. We can offer operation video and English operation
muanual. We can provide video-conference. If customers require on-site service, the transport and travel
expense shall be borne by customer.
Contact Person: Ms. KOMEG
Tel: +86-13143135835
Fax: 86-769-83396675